The Louise T Blouin Institute, London, UK The refurbishment of a 19th century coach-works into one of the
UKs largest privately funded, not for profit, cultural spaces for the Louise T
Blouin Foundation, has resulted in a magnificent naturally lit open plan building suitable
for hosting a wide range of artistic displays. |
|||
| _ | _ Project Title: |
_ The Louise T Blouin Institute No.3 Olaf Street, London _ |
|||
| _ | Scope of Works: | 33 x 5m Roof level glazed rooflight 30 x 3.8m Café glazed rooflight 1200m˛ Raised Access Floor _ |
|||
| _ | Cladding Details: | 76m˛ Double Glazed Units to
main rooflight comprising 10mm toughened float outer with Ipasol 50/25 performance
coating, 16mm air gap, 16.8mm matt white laminated inner pane. 91m˛ Double Glazed Units
to café rooflight comprising 10mm toughened low iron outer with Ipasol 73/39 performance
coating, 16mm air gap, 16.8mm low iron clear laminated inner pane. Approx 50m˛ 3mm thick
grade 1050A Aluminium flashings with 18mm WBP plywood backingGlazing units vary between
216 and 407kg each.Approx 130m˛ 3mm thick grade 1050A Aluminium cladding panels with 18mm
WBP plywood backing.1,200m˛ MERO-TSK Raised Access Floor with 10mm reconstituted granite
tiles bonded to calcium sulphate panels |
|||
| _ | Steelwork Details: | 7.5 tonnes steelwork comprising
120x60mm Raico Tee sections and 200x100x10 Angle sections _ |
|||
| _ | Year of Completion: | 2006 _ |
|||
| _ | Contract Duration: | 8 months _ |
|||
| _ | Client: | Louise T Blouin Foundation _ |
|||
| _ | Architect: | Borgos Dance Architects _ |
|||
| _ | Main Contractor: | Delcon Construction Ltd. _ |
|||
| . |