| . | |||||
| _ Construction Systems
_ Raised Access Floors |
_Projects Undertaken A sample of recently undertaken projects using MERO raised access
floor are listed below. Please contact us for further information on these or any other
projects. |
||||
| Arup
Group Ltd Headquarters, Fitzrovia, London 12,000m² Raised Access Floor 11,000m² of Medium grade MERO Raised Access Floor for office areas, with an additional 800m² of Barre Grey Granite sourced from Vermont bonded to Calcium Sulphate panels for the prestigious ground floor entrance, basement atrium and lift lobbies.This project has been challenging due to its position of restricted access meaning all materials had to be delivered on small vehicles in a Just In Time manner. Main
Contractor: Laing O'Rourke Construction South Ltd. |
|
||||
| Data
Centre, East Grinstead, West Sussex 3,500m² Raised Access Floor 3,500m² Extra Heavy Grade Calcium Sulphate panel factory bonded with Tarkett Antistatic vinyl covering, with floor heights ranging from 800mm to 1000mm. System includes bolt on stringers and a large quantity of Aluminium Air distribution Grilles to main data halls. Additional Medium Grade system was installed on upper level for office accommodation, and a slave floor was also installed to all main areas allowing overhead works to be carried out without damage to the Vinyl finish. The Clients ambitious start to finish programme of just 9 weeks were met. Main Contractor: Crown House
Technologies Ltd. |
|
||||
| Monsoon
Accessorise HQ, Notting Hill, London 12,000m² Raised Access Floor 11,000m² of Medium grade MERO Raised Access Floor for office areas, with an additional 1,000m² Quartzstone Engineered stone bonded to Calcium Sulphate panels, for the prestigious ground floor entrance atria. The raised floor was installed over 6 floors that were heavily services with pipes and basket runs. Main Contractor:
Laing O'Rourke Construction South Ltd. |
|
||||
| Foreign
& Commonwealth Office, Milton Keynes 5,000m² Raised Access Floor 5,000m² of MERO Raised Access Floor to the Foreign & Commonwealth Office ICT Building, Hanslope Park, Milton Keynes. Main Contractor: Sir Robert
McAlpine |
|
||||
| EHQ,
South Gyle, Edinburgh 9,500m² Raised Access Floor 9,500m² of MERO Raised Access Floor to a new office development. Contractor:
Laing O'Rourke Scotland Ltd. |
|
||||
| Lido
de France Medical Centre, Jersey 4,500m² Raised Access Floor 4,500m² of MERO Raised Access Floor has been installed to the Lido de France Medical Centre in St. Helier, Jersey. Client: Hotel de France |
|
||||
| Trafalgar
House, Croydon 5,000m² Raised Access Floor 5,000m² of MERO Raised Access Floor has been installed to eight floors of the Trafalgar House office building that is to be the new home for the Land Registry. Client:
ING Property Income Ltd |
|
||||
| Louise
T Blouin Institute, Olaf St, London 1,200m² Raised Access Floor 1,200m² of MERO Raised Access Floor with 10mm reconstituted granite tiles bonded to Calcium Sulphate panels, has been installed to two floors of the renovated Louise T Blouin Institute on Olaf Street in London. MERO-SCHMIDLIN (UK) PLC. also provided the 30m long glazed skylight and glazed cafe roof to the building. Main
Contractor: Delcon Construction Ltd |
|
||||
| Danske
Bank, 75 King William St, London 700m² per floor Type 5NB38 Raised Access Floor with Parquet 10mm Merbau Oil Finish Main Contractor: Denton Associates Status: Completed 2006 MERO RAISED ACCESS FLOOR |
|
||||
| Lion
Plaza, Threadneedle St, London 7,000m² Raised Access Floor Over 7,000m² of MERO Raised Access Floor has been installed to 6 floors of office refurbishment in the City of London. MERO-SCHMIDLIN (UK) PLC. also provided the frameless glazed atrium walls, lift shafts, backlit glass floors and the atrium roof to the building[link...]. MERO RAISED ACCESS FLOOR |
|
||||
| Further
UK Installations of MERO raised access floors Research Labs, Oxford 7000m² Raised Access Floor for HBG Construction Middlesex University 1500m² Raised Access Floor for Fitzpatrick Contractors Devon & Exeter Hospital 1200m² Raised Access Floor for HBG Construction Office Development, Nottingham 6500m² Raised Access Floor for Bowmer & Kirkland Basildon Hospital 900m² Raised Access Floor for H.W. Wilson Leeds & Bradford Airport 900m² Raised Access Floor for Leeds & Bradford Airport Office Development, Oxford 1500m² Raised Access Floor for Walter Lilley & Co. Ltd. Onyx, Wolverhampton 900m² Raised Access Floor for Onyx Environmental Group SDC, Watford 2500m² Raised Access Floor for SDC Group Office Development, Cambridge 2200m² Raised Access Floor for Bluestone Ltd. Swindon 9000m² Raised Access Floor for HBG Construction Harrogate 1000m² Raised Access Floor for Allenbuild Turner Ltd. |
|||||
| MERO RAISED ACCESS FLOOR | |||||